
<div><img class=”invisible” style=”display: none” src=”[images%7COpenAccessDataProvider]7c992874-5b2d-4d38-916f-dc709aa2a712?sfvrsn=fbb4655e_2″></div><div class=”w-100 position-relative”> <img src=”/ResourcePackages/Janes/assets/dist/images/placeholder-16-9.jpg” class=”invisible w-100″> <div style=”background-image: url(“https://www.janes.com/images/default-source/news-images/bsp_68676-jdw-24669.jpeg?sfvrsn=fbb4655e_2″)” class=”news-hero bg-center bg-cover position-absolute left-0 top-0 h-100 w-100″></div></div>
<p class=”text-body text-muted small”>The S-BR, 71.6 m long and displacing 1,870 tonnes, can carry 35 crew and has six 533 mm launch tubes firing either Naval Group F21 heavy weight torpedoes or MBDA Exocet SM39 Block 2 Mod 2 missiles. (Marinha do Brasil)</p>
<p>
The Brazilian Navy’s Submarine Development Program (Programa de Desenvolvimento de Submarinos: PROSUB) is to reach a new milestone on 12 January with the Submarines Force Command commissioning the second Riachuelo-class conventional attack submarine (SSK), S
<em> Humaitá </em>
(S41), at the Itaguaí Naval Complex (CNI), the navy told
<em>Janes</em>
.
</p>
<p>
New facilities for the Submarines Force Command at the Madeira Island Submarines Base (BSIM) will also be inaugurated on 12 January, the navy told
<em>Janes</em>
.
</p>
<p>
S
<em> Humaitá</em>
was launched on 11 December 2020 at CNI in the State of Rio de Janeiro and joins first-of-class S
<em>Riachuelo</em>
(S40), which was commissioned in September 2022.
</p>
<p>
Another two submarines,
<em></em>
S
<em>Tonelero </em>
(S42) and S
<em>Angostura </em>
(S43) are under construction at CNI by Itaguaí Construções Navais (ICN) for delivery in 2025 and 2026, respectively, the navy told
<em>Janes</em>
.
</p>
