Categories
JOSSICA

Brazil launches third Riachuelo-class SSK


Listen to this article
<div><img class=”invisible” style=”display: none” src=”[images%7COpenAccessDataProvider]a2d4b3ea-2540-48b7-a0fa-e413f71e3040?sfvrsn=6394fb1d_2″></div><div class=”w-100 position-relative”> <img src=”/ResourcePackages/Janes/assets/dist/images/placeholder-16-9.jpg” class=”invisible w-100″> <div style=”background-image: url(“https://www.janes.com/images/default-source/news-images/bsp_72925-jni-25851.jpeg?sfvrsn=6394fb1d_2″)” class=”news-hero bg-center bg-cover position-absolute left-0 top-0 h-100 w-100″></div></div>
<p class=”text-body text-muted small”>
S
Tonelero
was launched on 27 March.
(Brazilian Navy)</p>
<p>Brazilian shipbuilder Itaguaí Construções Navais (ICN) launched the third unit of the Riachuelo-class diesel-electric attack submarine (SSK), S<em> Tonelero</em> (S42), on 27 March.</p>
<p>The launch of the S<em> Tonelero</em> (S42) SSK by ICN (a joint venture between Novonor and Naval Group) took place at the Itaguaí Naval Complex.</p>
<p>The submarine is scheduled to be commissioned for Brazilian Submarine Force Command in May 2025, after the vessel completes successful sea trials, the Brazilian Navy told <em>Janes</em>.</p>
<p>S <em>Tonelero</em> is the third of four Riachuelo-class S-BR submarines purchased in 2009 as part of the Submarines Development Program (PROSUB), within the framework of the French-Brazilian strategic defence co-operation agreement signed in 2008.</p>
<p>The S-BR multi-purpose submarine was designed to fulfill anti-surface and anti-submarine warfare, special operations, and intelligence gathering missions.</p>
<p>It has six weapon launching tubes for the MBDA Exocet SM39 Block 2 Mod 2 anti-ship missile and Naval Group F21 heavyweight torpedo.</p>
<p>The first-of-class boat S <em>Riachuelo</em> (S40) and the second submarine S <em>Humaitá</em> (S41) were commissioned in September 2022 and January 2024 respectively. ICN is in the final stages of building the last Riachuelo-class submarine S <em>Angostura</em> (S43). The submarine is scheduled to be launched in 2025 and commissioned in 2026, the Brazilian Navy told <em>Janes</em>.</p>